Project Overview

Location:
She-Oak Lane, Casuarina, NSW 2487

System Components
Inverters: 2 x Growatt 5000 TL-X
Solar Panels: 36 x 350W

System Capacity:
Total System Capacity: 12.6 kW (2 inverters x 5 kW each + 36 panels x 0.35 kW each)

Installation Date:
The solar energy system was commissioned on 19/01/2021.

System Design and Configuration:

Growatt 5000 TL-X Inverters:
The Growatt inverters were chosen for their efficiency and compatibility with the two-phase power configuration. String inverter configuration ensures optimal energy conversion.

Solar Panels:
The 36 solar panels, each with a capacity of 350 watts, were strategically positioned to maximize exposure to sunlight. Monocrystalline cells contribute to enhanced energy production.

Performance Analysis

Energy Production:
Regular monitoring of the system’s performance demonstrates consistent energy production.

Efficiency:
Assess the efficiency of the Growatt inverters and solar panels under various conditions.

Environmental Impact

Carbon Footprint Reduction:
The solar installation at Casuarina, NSW 2487 has significantly reduced reliance on conventional energy sources, leading to a notable reduction in carbon emissions.

Maintenance and Monitoring:

Remote Monitoring:
The Growatt inverters’ remote monitoring capabilities facilitate real-time performance tracking.